DPZC5ZDGBIPOSTUDIO Architetti srl
Italija
Ocjena ocjenjivačkog suda
Kontinuirana kupolasta ploha, oslonjena u osam točaka, obuhvaća tribinsku zdjelu i oblikuje prepoznatljivu, nisku siluetu stadiona. Glavni pristup vodi preko povišene javne platforme koja se uvlači pod krov i povezuje vanjski prostor s ophodnim prstenom tribina. U anketnom dijelu ista zelena platforma povezuje atletski stadion, sportske dvorane i otvorene sadržaje, dok su promet i parkiranje spušteni pod teren prema Borongaju. U trećem krugu eliminirani su dobro razrađeni, ali generički projekti, prijedlozi hermetičnog odnosa prema javnom prostoru, projekti s nedovoljno razrađenim konstrukcijskim sustavom te financijski zahtjevna rješenja ili rješenja koja nisu dovoljno jasno izražavala primarni program. Velik broj radova ponudio je dobro artikuliran, ali nedovoljno specifičan odnos prema lokaciji i njezinu nasljeđu. Posebno je zanimljiv bio projekt koji je zadržavao dijelove postojeće konstrukcije, no takav pristup nije bio izvediv zbog potrebe za njezinim uklanjanjem uslijed utvrđenih konstrukcijskih nedostataka.
English
A continuous domed surface, supported at eight points, encloses the seating bowl and defines the stadium’s low, recognisable silhouette. The main approach rises onto an elevated public platform that slips beneath the roof and links the surrounding landscape with the concourse ring. In the survey area, the same green platform connects the athletics stadium, sports halls and outdoor programmes, while traffic and parking are placed below ground toward Borongaj. In the third round, the jury eliminated projects that were well developed but generic, hermetic in their relationship with public space, insufficiently resolved in structural terms, financially demanding or unable to express the primary programme clearly. A large proportion of the proposals offered a well-articulated but insufficiently specific response to the site and its legacy. A project that retained parts of the existing structure was considered particularly interesting, but this approach was not feasible because the structure had to be demolished due to identified structural deficiencies.
Tim
| IPOSTUDIO Architetti srl |
| Rang | 55. mjesto (od 85) |
|---|---|
| Ocjenjivanje | ispao u 3. krugu (od 5) |
| Predano | 16.07.2026 12:12:36 |
| Redni broj | 5 |