82WWCRXWESIRRAH-PROJEKT d.o.o.
Hrvatska
Ocjena ocjenjivačkog suda
Pet horizontalnih zelenih pojaseva obavija kompaktni volumen stadiona i prenosi logiku maksimirskih staza na njegov parter, terase i pročelje. Iznad ritma vitkih stupova lebdi široki zaobljeni krov, dok otvorene promenade, aktivna prizemlja i ozelenjene etaže ublažavaju mjerilo tribinske zdjele i povezuju je s parkom. U anketnom dijelu mreža trgova, pješačkih ruta i zelenih koridora organizira atletiku, dvorane, bazen, nogometni kampus i Borongaj kao jedinstven sportski distrikt za svakodnevno korištenje. U trećem krugu eliminirani su dobro razrađeni, ali generički projekti, prijedlozi hermetičnog odnosa prema javnom prostoru, projekti s nedovoljno razrađenim konstrukcijskim sustavom te financijski zahtjevna rješenja ili rješenja koja nisu dovoljno jasno izražavala primarni program. Velik broj radova ponudio je dobro artikuliran, ali nedovoljno specifičan odnos prema lokaciji i njezinu nasljeđu. Posebno je zanimljiv bio projekt koji je zadržavao dijelove postojeće konstrukcije, no takav pristup nije bio izvediv zbog potrebe za njezinim uklanjanjem uslijed utvrđenih konstrukcijskih nedostataka.
English
Five horizontal planted bands wrap the stadium’s compact volume, translating the logic of Maksimir’s paths into its ground plane, terraces and façade. A broad rounded roof floats above a rhythm of slender columns, while open concourses, active ground floors and planted levels soften the scale of the seating bowl and connect it to the park. In the survey area, a network of plazas, pedestrian routes and green corridors organises athletics, sports halls, the swimming complex, football campus and Borongaj as a unified sports district for everyday use. In the third round, the jury eliminated projects that were well developed but generic, hermetic in their relationship with public space, insufficiently resolved in structural terms, financially demanding or unable to express the primary programme clearly. A large proportion of the proposals offered a well-articulated but insufficiently specific response to the site and its legacy. A project that retained parts of the existing structure was considered particularly interesting, but this approach was not feasible because the structure had to be demolished due to identified structural deficiencies.
Tim
| SIRRAH-PROJEKT d.o.o. |
| Rang | 41. mjesto (od 85) |
|---|---|
| Ocjenjivanje | ispao u 3. krugu (od 5) |
| Predano | 17.07.2026 17:40:36 |
| Redni broj | 71 |