40. mjesto · šifra RYX76HLBI

O+M Architekten GmbH

Njemačka

O+M Architekten GmbH — natječajni rad
Službena slika iz Priloga III, str. 145. Klik za punu veličinu.

Ocjena ocjenjivačkog suda

Niz masivnih bijelih rebara obavija stadion, ritmizira pročelje i jasno pokazuje konstruktivnu logiku građevine. Između nosača ostaju otvorene promenade, tribinska konstrukcija i ostakljeni javni sadržaji, dok se krov radijalno širi prema središnjem otvoru. U anketnom dijelu modelirani park razvija se u dvije razine: središnja zelena os povezuje Maksimir i Borongaj, a uzdignuti krajolik prekriva dijelove programa, oblikuje trgove, rekreacijske zone i zelene krovove te povezuje stadion, bazen, atletiku i dvorane. U trećem krugu eliminirani su dobro razrađeni, ali generički projekti, prijedlozi hermetičnog odnosa prema javnom prostoru, projekti s nedovoljno razrađenim konstrukcijskim sustavom te financijski zahtjevna rješenja ili rješenja koja nisu dovoljno jasno izražavala primarni program. Velik broj radova ponudio je dobro artikuliran, ali nedovoljno specifičan odnos prema lokaciji i njezinu nasljeđu. Posebno je zanimljiv bio projekt koji je zadržavao dijelove postojeće konstrukcije, no takav pristup nije bio izvediv zbog potrebe za njezinim uklanjanjem uslijed utvrđenih konstrukcijskih nedostataka.

English

A sequence of massive white ribs wraps the stadium, giving rhythm to the façade and clearly expressing the building’s structural logic. Between the supports, open concourses, the seating structure and glazed public programmes remain visible, while the roof spreads radially toward the central opening. In the survey area, the modelled park develops across two levels: a central green axis links Maksimir and Borongaj, while an elevated landscape covers parts of the programme, forms plazas, recreation areas and planted roofs, and connects the stadium, swimming complex, athletics and sports halls. In the third round, the jury eliminated projects that were well developed but generic, hermetic in their relationship with public space, insufficiently resolved in structural terms, financially demanding or unable to express the primary programme clearly. A large proportion of the proposals offered a well-articulated but insufficiently specific response to the site and its legacy. A project that retained parts of the existing structure was considered particularly interesting, but this approach was not feasible because the structure had to be demolished due to identified structural deficiencies.

Tim

O+M Architekten GmbH
Rang40. mjesto (od 85)
Ocjenjivanjeispao u 3. krugu (od 5)
Predano17.07.2026 17:41:50
Redni broj72