45. mjesto · šifra G8UJEOMVM

GEplus arhitekti d.o.o

Hrvatska · Srbija

GEplus arhitekti d.o.o — natječajni rad
Službena slika iz Priloga III, str. 89. Klik za punu veličinu.

Ocjena ocjenjivačkog suda

Horizontalne metalne lamele obavijaju zaobljeni volumen i naglašavaju slojevitu organizaciju stadiona, dok se široki krov blago podiže iznad kontinuiranog staklenog pojasa. Pristupi su oblikovani kao sustav usječenih rampi i monumentalnih stuba koje iz parkovnog terena vode prema povišenom ophodu. U anketnom dijelu dva prostorna rastera razdvaja središnja zelena „pukotina”, razvijena u pješačko-biciklističku promenadu koja povezuje Maksimir, sportske sadržaje i prometno čvorište Borongaj. U trećem krugu eliminirani su dobro razrađeni, ali generički projekti, prijedlozi hermetičnog odnosa prema javnom prostoru, projekti s nedovoljno razrađenim konstrukcijskim sustavom te financijski zahtjevna rješenja ili rješenja koja nisu dovoljno jasno izražavala primarni program. Velik broj radova ponudio je dobro artikuliran, ali nedovoljno specifičan odnos prema lokaciji i njezinu nasljeđu. Posebno je zanimljiv bio projekt koji je zadržavao dijelove postojeće konstrukcije, no takav pristup nije bio izvediv zbog potrebe za njezinim uklanjanjem uslijed utvrđenih konstrukcijskih nedostataka.

English

Horizontal metal fins wrap the rounded volume and emphasise the stadium’s layered organisation, while a broad roof rises gently above a continuous glazed band. Entrances are formed through a system of sunken ramps and monumental stairs leading from the park terrain to the elevated concourse. In the survey area, two spatial grids are separated by a central green “crack”, developed as a pedestrian and cycling promenade linking Maksimir Park, the sports facilities and the Borongaj transport hub. In the third round, the jury eliminated projects that were well developed but generic, hermetic in their relationship with public space, insufficiently resolved in structural terms, financially demanding or unable to express the primary programme clearly. A large proportion of the proposals offered a well-articulated but insufficiently specific response to the site and its legacy. A project that retained parts of the existing structure was considered particularly interesting, but this approach was not feasible because the structure had to be demolished due to identified structural deficiencies.

Tim

GEplus arhitekti d.o.oNositelj prava
Đorđe Bajilo arhitekti d.o.o.Nositelj prava
Rang45. mjesto (od 85)
Ocjenjivanjeispao u 3. krugu (od 5)
Predano17.07.2026 16:13:41
Redni broj44

Objave i mediji