46. mjesto · šifra UXADSRW1U

ATOM ARHITEKTURA d.o.o.

Hrvatska

ATOM ARHITEKTURA d.o.o. — natječajni rad
Službena slika iz Priloga III, str. 65. Klik za punu veličinu.

Ocjena ocjenjivačkog suda

Velika skulpturalna ovojnica oblikovana je kao gotovo zatvoreni kameni prsten s dubokim otvorima prema Maksimirskoj ulici i parku. Sjeverna tribina je spuštena, a krov se iznad nje rastvara u široku šupljinu koja vizualno povezuje igralište sa šumom. U anketnom dijelu atletski stadion, rukometna i višenamjenska dvorana oblikuju zeleni urbani front uz Svetice i Divka Budaka, dok ih s Borongajem povezuje kontinuirana pješačka promenada s nizom javnih prostora. U trećem krugu eliminirani su dobro razrađeni, ali generički projekti, prijedlozi hermetičnog odnosa prema javnom prostoru, projekti s nedovoljno razrađenim konstrukcijskim sustavom te financijski zahtjevna rješenja ili rješenja koja nisu dovoljno jasno izražavala primarni program. Velik broj radova ponudio je dobro artikuliran, ali nedovoljno specifičan odnos prema lokaciji i njezinu nasljeđu. Posebno je zanimljiv bio projekt koji je zadržavao dijelove postojeće konstrukcije, no takav pristup nije bio izvediv zbog potrebe za njezinim uklanjanjem uslijed utvrđenih konstrukcijskih nedostataka.

English

A large sculptural envelope is conceived as an almost enclosed stone ring cut by deep openings toward Maksimirska Street and the park. The north stand is lowered, while the roof opens above it into a broad cavity that visually connects the pitch with the forest. In the survey area, the athletics stadium, handball arena and multipurpose hall form a green urban frontage along Svetice and Divka Budaka streets, linked to Borongaj by a continuous pedestrian promenade with a sequence of public spaces. In the third round, the jury eliminated projects that were well developed but generic, hermetic in their relationship with public space, insufficiently resolved in structural terms, financially demanding or unable to express the primary programme clearly. A large proportion of the proposals offered a well-articulated but insufficiently specific response to the site and its legacy. A project that retained parts of the existing structure was considered particularly interesting, but this approach was not feasible because the structure had to be demolished due to identified structural deficiencies.

Tim

Hrvoje MarinovićAutor
Stjepan MiketekAutor
Ana TomšićAutor
Katarina KovačićAutor
Rang46. mjesto (od 85)
Ocjenjivanjeispao u 3. krugu (od 5)
Predano17.07.2026 12:50:24
Redni broj32

Objave i mediji